What is Neev for?
Neev runs a for-sale development through preconstruction — presales and buyer deposits, entitlements and permits, trade buyout against the GMP, and the conditions you have to satisfy to close the construction loan. It's the developer's cockpit between underwriting and breaking ground.
Why do presales matter so much?
Lenders usually require a pre-sale threshold before they'll fund construction. Every unit pre-sold at base price adds to the presold sellout, which de-risks the loan and proves market demand — so the sales pipeline is the first thing the bank looks at.
What is the absorption schedule?
It's your sales pace over time. For each period you log the units you planned to sell (projected) and what you actually sold. Neev builds the cumulative sales curve, computes your absorption pace (units per period), and projects how many periods until you sell out. A slower-than-planned pace pushes back when your equity comes back and when the project fully de-risks.
How do buyer deposits offset equity?
Deposits collected into escrow are pre-sale capital. Depending on the structure, they can be applied against the equity you'd otherwise have to fund, lowering your day-one cash. The Deposit schedule tracks what's contractually owed versus what's actually been collected.
What is the GMP and "buyout"?
The guaranteed maximum price is your trade budget. Buying out a package means locking that scope under an executed subcontract at a firm price. The share bought out tells the lender how much of the budget is de-risked; the rest is your open exposure.
Deposits tab vs. Escrow tab?
The Deposits tab is the schedule — what % of price is owed at each milestone and how much that totals. The Escrow tab is the ledger — the actual buyer-by-buyer cash sitting in escrow, each with its release condition and status (held / released / refunded). The escrow reconciliation compares what's actually been received against what the schedule says is contracted, so you can see the outstanding gap.
What are entitlements and permits?
The government approvals required before you can build — rezoning, site plan, building permit, and so on. Neev tracks each one's authority, target date and status, so you can see what's gating the closing.
What are the conditions to close the construction loan?
The lender's checklist that must be satisfied before they fund — pre-sale level met, permits in hand, GMP bought out to a threshold, equity funded. Readiness to close tracks each condition as met or open.
Where does the budget come from?
Neev can start from your Torana underwriting, carrying the development budget and unit assumptions across so preconstruction begins from the same numbers you closed the deal on.
How does the design team bid link work?
On Design team, create one bid link per development and send it to every consultant: architect, structural, MEP, civil, landscape and the rest. They don't need an account. The link shows your invitation (project info, timeline, key dates and documents). Each consultant picks a discipline, uploads a proposal and breaks the fee into concept, schematic design, DRC package, design development, construction documents and construction administration. Questions they send are answered on the page for every bidder. Close bidding at the deadline.
How do I compare and award proposals?
Proposals are grouped by discipline. Compare lines them up stage by stage, marks the lowest price on each row in green, and shows exclusions, reimbursables and the variance to your budget allowance. The lowest fee isn't always the best value, so read the exclusions. Award one firm per discipline; its fees move into Cash requirements on that discipline's stage timing.
How does the design schedule work?
On Design team → Schedule, each awarded consultant’s design stages become deliverables. Planned dates come from the stage timing in Cash requirements, and a baseline is saved the first time a deliverable appears. Enter each consultant’s forecast and % complete as you hear from them. Every deliverable is gated by the next milestone after its planned date (phase ends such as the DRC submission, plus any you add). Neev flags a design sprint when a forecast misses its milestone or leaves less than a week of buffer. Apply forecasts to cash moves those stages in Cash requirements so fee timing matches the schedule.
How do consultant invoices work?
On Design team → Invoices, every awarded firm gets an invoice list tied to its fee stages. A firm can submit an invoice from its workspace, or you can add one yourself. Split each invoice across the stages it bills, then Approve it and Mark paid once the payment goes out (Neev records payments, it doesn’t send them). Dispute or Reject sends your note to the firm. Firms only ever see their own invoices.
What does “billed ahead” mean?
Neev compares each stage’s % billed with its % done in Design team → Schedule. When billing runs more than 10 points ahead of the work, the stage is flagged before you approve. Common fixes: approve part of the invoice, ask the firm for an updated % complete, or approve with a note. Stages without schedule progress (like CA) aren’t checked.
How do paid invoices change Cash requirements?
Once a stage has a paid invoice, its line in Cash requirements switches from plan to actuals: each payment sits in the month it was paid, and whatever is left of that stage spreads over its remaining months, starting no earlier than this month (if its months have passed, the rest shows as owed this month). Stages with no payment yet keep their plan. Retainage, if you hold it, stays owed until you release it.
How does Neev read a proposal, agreement or invoice?
Click Read it next to a PDF (when you add a proposal or an invoice), or Read the signed agreement on an awarded firm in Design team → Invoices. Neev pulls the text out of the PDF in your browser, and a reading service drafts the fees, stages, dates and terms. You see each value next to the exact words it came from, tick what to use, and click Apply: nothing changes before that. Scanned PDFs work too (the first 10 pages). Consultants can do the same on the bid page to fill their own form. Neev doesn’t keep the document text.
How do I read the fee timeline?
On Design team → Fee timeline, each awarded firm gets one line, and each of its fee stages is a bar on the project months, using the timing in Cash requirements. A bar fills to the stage’s % done from Schedule. It turns amber when the stage is behind schedule (a dashed tail shows the forecast slip) and red when it’s billed more than 10 points ahead of the work. A striped bar has no progress entered yet. Dashed red lines are milestones like the DRC submission; the blue line is today. Click a firm to see its planned fee by month next to what it has billed, with months where billing ran ahead of the plan in red.
Can Neev read a consultant’s email?
Yes. On Design team → Schedule, Fee timeline or Invoices, click From an email. Drop the email saved as a file (drag it from Mail or Outlook to your desktop, then into Neev: it’s a .eml file) along with any PDFs, or paste the text. Neev finds which awarded firm sent it, the new forecast dates and % complete it states, and any invoice (with its PDF attached to the invoice). Each one shows next to the words it came from; tick what to use and click Apply. Questions in the email are listed so you can answer them. Outlook .msg files can’t be read: save the email as .eml, or paste the text.
What is the cash requirements schedule?
It's a month-by-month projection of soft costs: design fees, consultants, permitting, marketing, taxes, development management. Each line has a start and a number of months, and its amount spreads evenly across them. Starts are tied to phases (Pre-DRC, DRC, building permit, construction), so if DRC takes two months longer, everything after it moves with it. The peak month and phase totals tell you when the cash goes out and how much each phase needs.
How do investors, escrow and the preferred return work?
On Investors, list each investor and their commitment. When they send money it goes into escrow: record it as a deposit. When the project needs cash, draw from escrow; Neev splits the draw across investors by commitment, capped at what each has in escrow. The preferred return accrues on each draw from the day you pull it (or from the deposit date, if you set the clock that way), simple or compounded annually. Pick any as-of date to see what you owe each investor then: their capital plus accrued pref.
Why don't I see Sales, Absorption, Deposits or Escrow?
Those tabs are for for-sale projects (condos). A rental, commercial or mixed-use project without for-sale units hides them. Projects imported from Torana know this from the underwriting. To change it, open Details and set For-sale units to Yes or No.
How do team accounts work?
The account that owns your developments is the master account. Under your account (the avatar) → Manage team, add the people who work on them by email. Each person gets a role: Admin (everything, including awards, invoice approvals, Investors and users), Editor (edits every area except Investors), Contributor (edits the design team and documents, views the rest) or Viewer. You can then set any area to None, View or Edit for that person, and limit them to some developments. Only the master account or an Admin can award a bid, approve or pay an invoice, see Investors, share or delete a development, or manage users. Everything a user adds belongs to the master account, so removing someone never removes their work, and their changes show in Activity. Pricing: $300 a month includes the master account, plus $100 a month per user.
How do timesheets work?
Click Time (next to Development and Portfolio). Fill in your week: add a row for each development and task, enter hours by day, and Submit. You can Recall it until it’s reviewed. The master account or an Admin approves it under Approvals, or sends it back with a note. Approving stamps the person’s cost rate, so each development shows labor cost (hours × rate) in the Summary, where reviewers also set cost rates and the task list. People never see rates.
How does the QuickBooks download work?
Click QuickBooks (master account and Admins). First, have your bookkeeper fill in QuickBooks settings: account names, a service item for time, bill terms, and the QuickBooks project (Customer:Project) and class for each development; names must match QuickBooks exactly. Then pick a period and what to include (consultant bills, payments, approved time, investor money) and Prepare the download. QuickBooks Desktop gets one .iif file (File → Utilities → Import → IIF Files). QuickBooks Online gets .csv files for Settings → Import data: bills, journal entries (payments, labor cost, investor money), and time for QuickBooks Time or an import app. If your QuickBooks Online has no bill import, use the bills-as-journal-entries file. Imported payments aren’t matched to their bills, so apply them in QuickBooks. Click Mark these as sent so the next download leaves them out.
We’re an architecture or design firm. How do we bill by phase?
In your account window, set Your firm to Architecture or design firm: Neev then says project instead of development, and timesheets start with design phases. Under Billing → Clients, open the client and click + Fee by phase: enter the total fee and the share of each phase (schematic design, design development, construction documents, bidding and permitting, construction administration; edit or add your own). Each month, on a new invoice, click + Fee by phase and enter % complete for each phase. Neev bills what’s earned since the last invoice and the PDF shows fee, % complete, earned to date, previously billed and this invoice for every phase. Add your logo under Billing → Settings.
How do I invoice my clients?
Click Billing (master account and Admins). Under Settings, add your company name, address and payment instructions (wire/ACH), plus each person’s billing rate. Under Clients, add who you bill (a development’s owner LLC or an outside client) with billing emails, terms and any standing fees, such as a monthly management fee. Then New invoice: add this period’s fees, approved team time at billing rates, paid consultant invoices as reimbursable costs (at cost or with the client’s markup), or any line. Anything already on another invoice is left out. Send emails a PDF with your payment instructions; Neev never takes payment. Record payments as they arrive, in full or in part. Sent invoices and payments received go into the QuickBooks download.
What do the share links do?
View — full read-only. Partner — a lighter external share. Copy — lets another Torana Labs user clone the project. Every link is revocable.
Does my work save automatically?
Yes — every edit autosaves to your account and syncs across devices. Sign in from the top-right to keep work across devices and enable sharing.